- Procurement of apkant press 600t/6000mm.
- Procurement of the sixth horizontal drill.
Archives: Timeline Stories
Timeline Post Type Description
- Construction of an assembly hall
- Procurement of a new CNC press brake 400t/4000mm.
- Construction and commissioning of a chamber sandpit.
- Procurement of equipment for electric arc metallization.
Izgradnja hale
- Construction of a hall for surface protection.
- Procurement of new equipment for dry and wet painting.
Purchase and commissioning of 3 horizontal drills - milling machines.
Purchase and commissioning of four-roll sheet metal rolling machine 30mm/3000mm.
Start of production of equipment for the ship industry.
- Construction of a new production hall.
- Intensive investment in machining equipment.
Promena statusa firme
In 2003 the company chaned its status to Metalac ad Novaci. Acquisition of the program and production of the spare parts for the process industry have begun.
Osvajanje i početak proizvodnje

Conquest and start of production of heater linings and welded pipes of all diameters and wall thicknesses.
Non-standard welded pipes